﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:trackback="http://madskills.com/public/xml/rss/module/trackback/">
  <channel>
    <title>Projects</title>
    <description>Blogs about the different projects around Levisham station</description>
    <link>http://www.lsg.org.uk/Blog/tabid/92/BlogId/1/Default.aspx</link>
    <language>en-GB</language>
    <managingEditor>levisham@nymr.co.uk</managingEditor>
    <webMaster>paul@wsme.co.uk</webMaster>
    <pubDate>Fri, 05 Sep 2008 18:22:51 GMT</pubDate>
    <lastBuildDate>Fri, 05 Sep 2008 18:22:51 GMT</lastBuildDate>
    <docs>http://backend.userland.com/rss</docs>
    <generator>Blog RSS Generator Version 3.2.0.29758</generator>
    <item>
      <title>Weighbridge open for business</title>
      <description>The weighbridge opened for business on 2nd August</description>
      <link>http://www.lsg.org.uk/Blog/tabid/92/EntryID/3/Default.aspx</link>
      <author>levisham@nymr.co.uk</author>
      <comments>http://www.lsg.org.uk/Blog/tabid/92/EntryID/3/Default.aspx#Comments</comments>
      <guid isPermaLink="true">http://www.lsg.org.uk/Default.aspx?tabid=92&amp;EntryID=3</guid>
      <pubDate>Sun, 10 Aug 2008 17:21:00 GMT</pubDate>
      <slash:comments>0</slash:comments>
      <trackback:ping>http://www.lsg.org.uk/DesktopModules/Blog/Trackback.aspx?id=3</trackback:ping>
    </item>
    <item>
      <title>Weighbridge nears completion</title>
      <description>&lt;p&gt;The brickwork, roof with ridge tiles and guttering has been completed. Internally the first fit wiring has been completed and the walls have now been plastered.&lt;/p&gt;
&lt;p&gt;Works over the next week or so will include painting, tiling and installing kitchen units.&lt;/p&gt;
&lt;p&gt;Completion is still planned for the end of June.&lt;/p&gt;</description>
      <link>http://www.lsg.org.uk/Blog/tabid/92/EntryID/2/Default.aspx</link>
      <author>levisham@nymr.co.uk</author>
      <guid isPermaLink="true">http://www.lsg.org.uk/Default.aspx?tabid=92&amp;EntryID=2</guid>
      <pubDate>Fri, 09 May 2008 21:02:00 GMT</pubDate>
      <trackback:ping>http://www.lsg.org.uk/DesktopModules/Blog/Trackback.aspx?id=2</trackback:ping>
    </item>
    <item>
      <title>Update on catering outlet</title>
      <description>Major site works commenced in January to install the weighbridge and construct the building shell.</description>
      <link>http://www.lsg.org.uk/Blog/tabid/92/EntryID/1/Default.aspx</link>
      <author>levisham@nymr.co.uk</author>
      <comments>http://www.lsg.org.uk/Blog/tabid/92/EntryID/1/Default.aspx#Comments</comments>
      <guid isPermaLink="true">http://www.lsg.org.uk/Default.aspx?tabid=92&amp;EntryID=1</guid>
      <pubDate>Sun, 02 Mar 2008 10:30:00 GMT</pubDate>
      <slash:comments>0</slash:comments>
      <trackback:ping>http://www.lsg.org.uk/DesktopModules/Blog/Trackback.aspx?id=1</trackback:ping>
    </item>
  </channel>
</rss>