Yard Works

A new NER style fence is being installed down the yard to separate the public from the siding. The fence around the Camping Coach is being upgraded as part of this project to bring it up to the same standard.

The coach roofed hut at the bottom of the yard has had a plank screen erected between the hut and the boundary fence.

Most of the large stone blocks stored in our yard for many years have been sent to Pickering to aid the rebuilding of the beckside wall behind the new Train of Thought Education Building.

A new hazel panel fence is to be erected to screen our outdoor stores and tidy up the view when you enter our station. Sponsorship of the panels would be appreciated, ten being required at £40 each.

Latest News
Galleries
Malcolm and Dorreen train the new starter 19Feb12Beth and Matthew load wagons with road material dug from the crossing 19Feb12Stephen and Brian backfill the duct route 18Feb12Level crossing deck lifted for check rail installation whilst Brian and Stephen lay troughing 4Feb12
Wikipedia

Click above to see our Wiki Entry
Tag Cloud